TAIS projects guide: programs and product catalog

TAIS projects guide: programs and product catalog
Show Article Summary

Quick answer: This guide gathers the projects and product catalog of TAIS Shipyards on a single page. The consortium takes part in serial production of the İstif-class frigates for the Turkish Naval Forces, its member yards’ references run from TCG Anadolu to TCG Derya, and the official catalog lists more than fifty designs from corvette to floating dock. The index below gives access to every file in the cluster and to the main product groups in the catalog.

Cluster index

Summary of Turkey programs

ProgramShipShipyardStatus
MİLGEM İstif classTCG İzmir (F-516)Anadolu (ADİK)Launched; fitting out
MİLGEM İstif classTCG İzmit (F-517)SedefLaunched; fitting out
MİLGEM İstif classTCG İçel (F-518)SefineConstruction/outfitting
MİLGEM İstif classTCG Karadeniz (F-520)SedefLaunched in 2026
LHD (reference)TCG Anadolu (L-400)SedefIn service
LST (reference)TCG Bayraktar, TCG SancaktarAnadolu (ADİK)In service
DİMDEG (reference)TCG Derya (A-1590)SefineDelivered: January 2024

The table shows the İstif production carried out under the consortium umbrella together with the reference projects the member yards completed under their own contracts. Sources for each ship-to-yard assignment are given individually in the relevant files.

Rendering of the FACM-70 missile-armed fast attack craft
FACM-70, from the fast attack craft line. Source: taisshipyards.com

Catalog product groups

The official website’s product index can be read in five main groups. The combatant line consists of the BORA family, the OPV series and the FAC/FACM/FPB boat tier. The amphibious line holds more than fifteen hulls from the LHD-230 down to the LCVP-16. The logistics line carries the FRT-200 tanker, the MPSRS-95 support vessel and the FD-160/170 floating docks; the training-support line the CTS-90, the ERV-90 and the diver boats; and under the unmanned systems heading the USV-15 Marlin unmanned surface vehicle is listed. The RPV-42 for river patrol and the CG-68 and CPV-56 for coast guard duties are the other hulls in the catalog.

Rendering of the USV-15 Marlin unmanned surface vehicle
USV-15 Marlin, the unmanned surface vehicle in the catalog. Source: taisshipyards.com

Export and cooperation summary

The agreement covering two İstanbul-class frigates for Indonesia, worth roughly 1 billion dollars, was signed in January 2026; two training ships were delivered to Qatar in 2021-2022; and the Indian fleet support ship process ended in 2024 with the removal of the Turkish side. The Pakistani and Ukrainian MİLGEM programs are not TAIS’s; they run under ASFAT and RMK Marine respectively. The sourced record of all these processes sits in the export file.

Rendering of the LST-120 tank landing ship
LST-120, one of the intermediate hulls of the amphibious line. Source: taisshipyards.com

How to use this cluster

The cluster is arranged so that a reader encountering TAIS for the first time starts from the hub file, while a reader tracking procurement and industry starts from the program files. Who the company is and its ownership history sit in the identity files; its actual work in Turkish Navy programs in the İstif file; its outward-facing offer portfolio in the product files; and its contract history in the export file. Each file ends with a source list and access date; numerical claims were kept strictly to data appearing in those sources, and no guesses were made about undisclosed information. The headings most likely to need updating as program statuses change are the İstif serial-production schedule and the implementation phase of the Indonesia contract.

Frequently asked questions

How many products does TAIS have?

The official product index lists more than fifty design pages including version variants. The main hulls with published numerical data are documented in the files of this cluster.

What is TAIS’s largest completed project?

As member-yard references, TCG Anadolu (Sedef) and TCG Derya (Sefine) stand out; the work under the consortium umbrella is the İstif-class serial production.

Have all the catalog designs been built?

No. The catalog largely consists of designs at the proposal stage; delivered examples are noted separately in the relevant files.

Are the USV-15 Marlin and the ASELSAN-Sefine MARLIN the same?

The TAIS catalog carries a page for an unmanned surface vehicle named USV-15 Marlin; the product’s relationship to other MARLIN programs is not officially disclosed.

When was the information in this cluster compiled?

All sources were accessed on August 13, 2026; program statuses reflect the open-source record as of that date.

Sources and verification note

The summary information in this guide is an index of data sourced file by file across the cluster; the main sources are below. Accessed: August 13, 2026.

  • TAIS official website, product index: https://www.taisshipyards.com/en/products
  • TAIS official website, about us: https://www.taisshipyards.com/en/about-us
  • Turkish Wikipedia, “İstif sınıfı fırkateyn”: https://tr.wikipedia.org/wiki/%C4%B0stif_s%C4%B1n%C4%B1f%C4%B1_f%C4%B1rkateyn
  • Defense News, “Turkey chooses local shipyards to build three frigates” (24.01.2023): https://www.defensenews.com/industry/2023/01/24/turkey-chooses-four-shipyards-to-build-three-frigates/
  • The Defense Post, “Turkey’s TAIS Signs $1B Frigate Agreement With Qatar’s Barzan for Indonesia” (21.01.2026): https://thedefensepost.com/2026/01/21/tais-frigate-agreement-indonesia/
  • Mavi Vatan, “(A-1590) TCG Derya”: https://mavivatan.net/a-1590-tcg-derya-denizde-ikmal-muharebe-destek-gemisi/
  • English Wikipedia, “Bayraktar-class tank landing ship”: https://en.wikipedia.org/wiki/Bayraktar-class_tank_landing_ship