Analiz

Featured in This Category
From T-38 Talon to HÜRJET: Türkiye’s Domestic Jet Trainer Programme

From T-38 Talon to HÜRJET: Türkiye’s Domestic Jet Trainer Programme

From Imported to Indigenous series · File 9 · Sarp GüçlüClass: A — Direct Replacement (intended relationship)Status today: Still in development/first-delivery phase — the first...

Featured in This Category
HÜRJET and the FA-50: How the Export Order Changed in the Jet Trainer Band

HÜRJET and the FA-50: How the Export Order Changed in the Jet Trainer Band

We step down a class from the fighter programmes: the advanced jet trainer and light attack band. It is one of the busiest corners of...

Featured in This Category
Dünyanın En Uzun Menzilli 12 Top Sistemi

Dünyanın En Uzun Menzilli 12 Top Sistemi

Dünyanın En Uzun Menzilli 12 Top Sistemi (2026): Türk Fırtınası Listede Nerede? Modern kara savaşının belirleyici sorusu artık "ne kadar hızlı ateş edebilirsin?" değil, "düşmanı...

Featured in This Category
From Licensed M109 to K9 Thunder: South Korea’s Howitzer Shift

From Licensed M109 to K9 Thunder: South Korea’s Howitzer Shift

From Imported to Indigenous series · File 8 · Sarp GüçlüClass D — Licensed Production to Indigenous Design: First licensed/co-production, later an independent design capability.Status...

Featured in This Category
From G3 to MPT-76: Turkiye’s Indigenous Rifle Transition

From G3 to MPT-76: Turkiye’s Indigenous Rifle Transition

From Imported to Indigenous series · File 7 · Sarp GüçlüClass B — Gradual Replacement: the domestic MPT-76 family is in frontline service, while the...

Featured in This Category
From BTR-70/80 to ARLAN: Kazakhstan’s Licensed-to-Local Production Shift

From BTR-70/80 to ARLAN: Kazakhstan’s Licensed-to-Local Production Shift

From Imported to Indigenous series · File 6 · Sarp Güçlü Class: D — From licensed production to indigenous design Status today: Licensed/joint production ongoing...

Featured in This Category
The ALTAY Programme From 2007 to 2026: Decisions, Powerpack and the Move to Series Production

The ALTAY Programme From 2007 to 2026: Decisions, Powerpack and the Move to Series Production

A tank programme is shaped not by a single decision but by a chain of linked ones: choice of contractor, powerpack supply, the series-production tender,...

Featured in This Category
From Cobra to ATAK: Türkiye’s Attack Helicopter Transition

From Cobra to ATAK: Türkiye’s Attack Helicopter Transition

From Imported to Indigenous series · File 5 · Sarp Güçlü Relationship type: B — Gradual Replacement Status today: TUSAŞ-built T129 ATAK has been entering...